16 March 2006 · Delegated - Director of Planning and Building Control (M. I. McCauley)
Isle Of Man Education, Rushen Primary School, Church Road, Port St. Mary, Isle Of Man, IM9 5lw
The proposal involved installing access ramps and handrails, replacing external doors with level thresholds, and removing plastic thresholds at the modern primary school building to improve wheelchair access. The works were shown on specific drawings received in December 2005.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The site is the curtilage of Rushen Primary School, designated as Primary School on the 1982 Development Plan. The proposal replaces external doors on the eastern elevation with level thresholds for w…
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved drawings
This permission relates to the installation of access ramps and handrails and the alterations to the existing doorways, all as shown in drawings reference D01, D02 A, D03 and D04 all received on 16th December, 2005.
Approved / no objection
Rushen Parish Commissioners approved the application for construction of ramps and steps at Rushen Primary School.
Rushen Parish Commissioners
SupportRushen Primary School, Church Road. Department of Education. Construction of access ramps and steps to facilitate access for the disabled. Approved.