2 March 2026 · Head of Development Management (Stephen Butler)
Loughen-E-Yeigh Farm, Bayr Ny Hayrey, Lezayre, Ramsey, Isle Of Man, IM7 2au
This application sought to satisfy Condition 6 of the prior approval 24/00453/B, which permitted demolition of an existing dwelling and buildings at Loughen E Yeigh Farm and creation of a new dwelling with drive access.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The submitted documents, including SolaX Meter Datasheet, SolaX X3-HYB G4 PRO Datasheet, drawing no. 901 (received 05.12.2025), and drawing no.
Strategic Policy 2 - Priority for new development to identified towns and villages
Strategic Policy 2(e) supports carbon reduction benefits. The battery storage system ensures effective energy storage as an integral part of the solar PV installation, fulfilling the policy's emphasis on sustainable energy measures.
Environment Policy 4
Energy Policy 4 requires battery storage to support solar PV installations. The submitted details confirm manufacturer specifications and location, enabling the policy's goals for energy efficiency.
General Policy 2
General Policy 2(b, c, g) addresses development quality, environmental impact, and sustainability. The approval confirms the details achieve the desired outcome without adverse impacts, aligning with these general development principles.
The revised plan is legible and acceptable.