16 January 2009 · Acting Senior Planning Officer (delegated under Article 3(13) of the Town and Country (Development Procedure) Order 2005)
Mount Pleasant, Main Road, Colby, Isle Of Man, IM9 4ae
The proposal involves extending an existing single-storey annex at the rear of a traditional cottage to create a new bedroom on the first floor and a rebuilt utility room on the ground floor. The extension matches the ridge height of the existing annex but is slimmer in width with no chimney.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The proposed extension will not be visible by the public and the change in appearance of the property as viewed alongside is not unacceptable.
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved drawings
This permission relates to the alterations and extensions shown in drawings 08 0471 01 and -02 both received on 21st November, 2008.
Obscured glazing
The new window in the side of the first floor extension, serving the toilet, must be fitted with glazing obscured to Pilkington Level 5 or equivalent and retained as such in perpetuity.
Do not oppose
No comment
No objection
Drainage Division has no objection subject to conditions on surface water discharge, Highways Division does not oppose, and Arbory Parish Commissioners have no comments.
Key concern: No discharge of surface water to foul drainage systems
Drainage Division
Conditional No Objection**No Objection** subject to the following conditions:-; The application states that the surface water from the proposed development is to be discharged to the “existing drainage”. If this “existing drainage” discharges (directly or indirectly) to the foul sewerage system then it should be noted that an alternative means of surface water disposal must be provided.
Conditions requested: There must be NO discharge of surface water (directly or indirectly) from this proposed development to any foul drainage system(s) so as to comply with the requirements of the Department of Transport Drainage Division and the Sewerage Act 1999; The applicant is required to establish where the existing surface water from the property is disposed and discuss this matter with the Drainage Division prior to work commencing on site; The applicant is requested to supply the Division a copy of any Building Control Application in relation to the surface water discharge from this development
Highways Division
No ObjectionDo not oppose
Arbory Parish Commissioners
No Commentmy Commissioners have considered the above application and have no comments to make