17 August 2006 · Delegated - Director of Planning and Building Control (M. I. McCauley)
13, Slieau Whallian Park, St. Johns, Isle Of Man, IM4 3jh
The proposal involved building a single-storey conservatory at the rear of the house at 13 Slieau Whallian Park in a residential area of St Johns. The conservatory was amended during the application process to reduce its projection to 2.2m after initial concerns from the Drainage Division that the original design would…
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The conservatory is located to the rear of the property and not visible from the street scene, causing no significant harm to visual amenities.
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved drawings
This permission relates to the erection of a rear conservatory as shown in drawing numbers 00436/1 date stamped 14th March 2006 and 00436/2 Rev A date stamped 29th June 2006.
Obscure glazing
The windows to be formed in the north-west and south-east facing elevations of the conservatory shall only be glazed or re-glazed with obscure glass.
Materials matching existing
No facing materials shall be used other than materials similar to those used on the existing building.
Surface water drainage
There must be no discharge of surface water to the main foul sewer.
no objections to this application
no objection in principle subject to no discharge of surface water to foul drainage and public sewer protection
no notes or objections recorded
Drainage Division initially objected and requested deferral due to the conservatory being over a public sewer, but after amended plans issued no objection subject to conditions on surface water discharge and sewer protection; German Parish Commissioners had no objections.
Key concern: proposed extension would be built directly over the main public sewer
Department of Transport Drainage Division
ObjectionThe proposed extension as shown in this planning application would, if approved be built directly over the main public sewer.; As this proposal stands the Division would object to this application; requests that any decision on this planning application be deferred until such time as a amended plan has been received
Department of Transport Drainage Division
Conditional No ObjectionNO OBJECTION In principle subject to:; There must be NO discharge of surface water (directly or indirectly) from this proposed development to any foul drainage system(s) so as to comply with the requirements of the Department of Transport Drainage Division.; Public sewerage crosses this site. The line of the sewer(s) must be identified before development work commences.
Conditions requested: There must be NO discharge of surface water (directly or indirectly) from this proposed development to any foul drainage system(s); The line of the sewer(s) must be identified before development work commences; The sewer(s) must be fully protected whilst all building works are being carried out; No part of the proposed development may be constructed, nor any trees planted, within two metres of any public sewer either at the time of construction or at any time in the future
German Parish Commissioners
No ObjectionMy Commissioners have no objection to this application
German Parish Commissioners
No ObjectionMy Commissioners have no objections this application