28 April 2006 · Director of Planning and Building Control (M. I. McCauley)
Middle Cordeman, Cordeman Road, St. Marks, Ballasalla, Isle Of Man, IM9 3aj
Creer Farms proposed a new agricultural building measuring 9.3m by 27.3m with a 6m ridge height, to be clad in profiled sheeting matching the adjacent barn, and about half its size. The building is sited amongst existing farm structures to support a growing enterprise in specialist animals and organic crops.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer assessed the proposal as appropriate for a growing agricultural enterprise involving specialist animals and organic crops.
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved plans
This permission relates to the erection of an agricultural building as shown in drawings 00303/1 and AT 777.1 both received on 10th February, 2006.
Agricultural use only
The building must only be used for agricultural purposes.
Materials
The building must be clad in dark coloured sheeting (dark green, dark grey or dark brown).
no objection as barn for livestock will not generate traffic increase
discuss working practices for high voltage underground cables and low voltage overhead lines
Manx Electricity Authority requires consultation on working practices around high voltage cables and overhead lines with reference to HSE guidance notes; Highways do not oppose as no traffic intensification expected; Malew Parish defers pending height and access details; private objection on traffic and need.
Key concern: High Voltage Underground cable and Low Voltage Overhead line in the area
Manx Electricity Authority
Conditional No ObjectionPlease contact Anthony Kinrade or Ian Horsey, Operations and Maintenance Dept, Network Services, as there are High Voltage Underground cable and Low Voltage Overhead line in the area.; All work on the site to be carried out with reference to HSE Guidance note GS6 and HSE Guidance note HS(G)47.
Conditions requested: Contact Anthony Kinrade or Ian Horsey, Operations and Maintenance Dept, Network Services, to discuss working practices around lines and cables which may be required to be diverted or shrouded before any work can be carried out on site; Contact the Planning Department to discuss proposed loads required; All work on the site to be carried out with reference to HSE Guidance note GS6 and HSE Guidance note HS(G)47; Contact the M.E.A. for an Electrical Site Safety 5
Department of Transport Highway Division
No ObjectionDo Not Oppose; The barn will be used for livestock and fodder storage and will not result in an itensification in traffic usage.
Malew Parish Commissioners
No CommentThe Commissioners wish to notify you that they would like to defer their decision, pending further information regarding the height of the building and the access lane.