11 March 2005 · Delegated - Director of Planning and Building Control (M. I. McCauley)
Old Hall, Patrick Corner, Patrick Village, Isle Of Man, IM5 3al
The proposal involves building a sun lounge extension underneath an existing rear extension supported on posts, plus a workshop alongside, both in uPVC, at the rear of Old Hall in Patrick Village. The site is next to a stream tributary to the River Neb and adjacent to sewage treatment works.
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The works are proposed to the rear of the Old Hall, which has little architectural merit, making the uPVC extension and workshop acceptable in that location.
Time limit
The development hereby permitted shall commence before the expiration of four years from the date of this notice.
Approved drawings
This approval relates to drawing number 01.
Stream bank protection
Prior to the commencement of works there shall be in place protective fencing positioned at the top of the river bank to prevent any damage to the banks of the stream and the stream bed.
Surface water drainage
There must be no discharge of surface water to the main foul sewer.
no adverse traffic impacts
No objection in principle subject to no discharge of surface water to foul sewer
Drainage Division has no objection subject to surface water discharge conditions; Inland Fisheries requires 8m setback from watercourse and construction safeguards; Highways has no views; Fire Safety recommends consultation with department.
Key concern: no development within 8 metres of the watercourse
Drainage Division
Conditional No ObjectionNO OBJECTION In principle subject to:; The applicant is reminded that the DOT Drainage Division requires access at all times to the adjacent Sewerage Treatment Works. No building materials or contractors vehicles shall be situated where they will hinder the access of the Division’s undertaking its routine maintenance.
Conditions requested: There must be NO discharge of surface water (including that from roofs and paved areas) from this proposed development to any foul drainage system(s) so as to comply with the requirements of the Department of Transport Drainage Division and the Sewerage Act 1999
Inland Fisheries Section
Conditional No ObjectionTo minimise the risk of pollution to the river and to avoid bankside erosion and loss of habitat, there must be no development within 8 metres of the watercourse.
Conditions requested: There must be no development within 8 metres of the watercourse; Measures must be in place during construction works to safeguard the water course from run-off and sedimentation
Highways Division
No CommentThe Highways Division of the Department of Transport has no views on the following application, the application having been considered and having no adverse traffic impacts.
Fire Safety Officer
I RECOMMEND THAT THE APPLICANT CONSULTS THE FIRE SAFETY DEPARTMENT TO DISCUSS THE DETAILS OF THIS APPLICATION.
Conditions requested: I RECOMMEND THAT THE APPLICANT CONSULTS THE FIRE SAFETY DEPARTMENT TO DISCUSS THE DETAILS OF THIS APPLICATION