Officer's Report
The application seeks approval for the erection of a two-storey detached dwelling on a plot of land in Jurby. The plot is one of ten plots permitted under an extant planning approval for self-build plots sold by DLGE.
The proposed dwelling accords with the design brief for the area and I recommend that the application be approved.
Application No.:
04/01597/B
Applicant:
Miss Louise Jane Kennedy
Proposal:
Construction of two storey detached timber frame dwelling with landscaping and driveway
Site Address:
Land Adjacent To Bretney Estate PLOT 9 Coast Road Jurby Ramsey
Case Officer:
Anthony Holmes
Photo Taken:
Site Visit:
Expected Decision Level:
Delegated Decision
Consulttee:
Highways Division
Notes:
Acknowledges receipt of application
Consulttee:
Jurby Parish Commissioners
Notes:
No objections
Consulttee:
Chief Fire Officer
Notes:
Smoke Alarm
Consulttee:
Drainage Division
Notes:
No objections, subject to conditions
Recommendation
Recommended Decision: Permitted Date of Recommendation: 07.09.2004
Conditions and Notes for Approval / Reasons and Notes for Refusal
C: Conditions for approval N: Notes attached to conditions R: Reasons for refusal O: Notes attached to refusals
C 1. The development hereby permitted shall commence before the expiration of four years from the date of this notice.
C 2. This approval relates to drawing no.s LK-04/02-1 and LK-04/02-2 date stamped the 30th July 2004.
C 3. The tree, shown on drawing no. LK-04/02-2 date stamped the 30th July 2004, must be planted in the first planting and seeding season following the completion of the development or the occupation of the dwellings, whichever is the sooner. Should the tree within a period of five years from the completion of the development die, be removed, or become seriously damaged or diseased it must be replaced in the next planting season with another of a similar size and species.
C 4. The proposed development must be connected to the main foul sewer.
NOTE: A Drainage Connection Fee will be payable to the Drainage Authority on this development
C 5. There must be no discharge of surface water to the main foul sewer.
N 6. The Chief Fire Officer recommends the installation of mains wired interconnected domestic smoke detection.
I confirm that this decision accords with Government Circular No 57/01 (Delegation of Functions to Director of Planning and Building Control).
Decision Made: Approval by delegation Signed: _________________________ Date: 13/9/04
M. I. McCauley Director of Planning and Building Control