11 June 2021 · Head of Development Management (Stephen Butler)
Tree Archyn Heritage Centre, Bridson Street, Port Erin, Isle Of Man, IM9 6an
Port Erin Commissioners applied to install three non-illuminated signs on the Heritage Centre at Bridson Street, Port Erin: one on the front elevation (2.75m x 400mm, white plastic with aluminium skin, black and red lettering and logos) and two on the side elevations (each 2.2m x 1.1m, matching finish), all positioned …
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer assessed whether the signage would adversely impact the character and appearance of the area or highway safety, the only considerations under the Control of Advertisements Regulations 2013…
General Policy 2
Requires development in accordance with Area Plan zoning to respect site/surroundings in siting, scale, design; not adversely affect landscape/townscape character or local amenity. Officer assessed signage as modest, relating well to basic building architecture in mixed-use area, adding interest without visual or amenity harm.
General Policy 6
Permits external advertisements in towns/villages if high design standard, relating to building/site, in keeping with area, no highway hazard. Officer found signs minimalist, matching finishes, non-prominent, positioned safely, compliant in mixed-use Port Erin context.
General Policy 7
Permits advertisements only on sites/buildings to which they relate in towns/villages. Officer confirmed signs directly promote the Heritage Centre's Tourist Information use on the building itself.
Time limit
The advertisement(s) hereby granted consent shall be begun before the expiration of four years from the date of this notice. Reason: To avoid the accumulation of unimplemented advertisement consents.
support the application
'No Flood Risk Management interest'
Port Erin Commissioners support the application for signage at the Heritage Centre. DOI Flood Risk Management Division has no interest in the application.
Port Erin Commissioners
SupportThe Board of Port Erin Commissioners discussed the above application at its meeting on 11th May 2021 and has resolved to support the application.
Department of Infrastructure (DOI) Flood Risk Management Division
No CommentNFRMI; No Flood Risk Management interest