18 March 2025 · Head of Development Management (Stephen Butler); issued by Director of Planning and Building Control (J Chance)
Field 311835, Glenfaba Road, Peel, Isle Of Man, IM5 1dx
This application sought approval of specific details to discharge condition 2 from the prior approval of PA 23/01407/B, which permitted a new Sewage Treatment Works and vehicular access. The condition required a soft landscaping scheme including details of trees to be retained, new trees and hedgerows, a landscaping pl…
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The submitted documentation, including the Revised Landscape Plan and C2 Soft Landscaping Plan Response received on 03.03.2025, was reviewed and deemed sufficient to achieve the desired outcome for co…
content with the details contained in the revised Proposed Landscaping Plan and the C2 Soft Landscaping Plan Response. Works should be undertaken in full accordance with these details.
Manx Utilities submitted a detailed Landscape and Ecological Mitigation and Management Plan (LEMMP) in response to condition 2 of PA 23/01407/B, outlining comprehensive measures for biodiversity enhancement, habitat protection, and long-term management at the Peel Wastewater Trea…
Manx Utilities
SupportThe purpose of this Landscape and Ecological Mitigation and Management Plan (LEMMP) is to detail how habitats and other ecological enhancements will be managed and maintained in the long-term.; This will result in the temporary loss of nesting habitat for birds and sheltering / feeding sites for Common Lizard Zootoca vivipara... Reinstatement... will in time create a net increase.; Reinstatement and creation of new hedgebanks will in time create a net increase in foraging habitat to bats.; Development shall be carried out in accordance with the approved details.
Conditions requested: No development shall take place, including works of site clearance and ground preparation, until a scheme, including a timetable for implementation, for the enhancement of biodiversity on the site, in accordance with the mitigation measures set out at Section 4.5 of Volume 1 of the Environmental Statement, has been submitted to and approved in writing by the Department. The scheme shall include details of an ongoing management scheme for the grassland areas and a bat and bird box plan. Development shall be carried out in accordance with the approved details.; C3 Biodiversity Mitigation Plan: A scheme detailing measures for the protection of trees along the southern edge of the site, trees in the vicinity of the new surface water outfall on the western site boundary, retained sod banks to the east and west of the site, and Field 311836 (outside of the road area). Development shall be carried out in accordance with the approved scheme, with the agreed protection measures to remain in place for the duration of the construction period.; C6 Construction Waste Management Plan: The Plan shall identify the main waste materials expected to be generated during the construction phase, together with measures for dealing with such materials so as to minimise waste and maximise re-use and recycling. Development shall be carried out in accordance with the approved Plan.; C7 Scheme for the mitigation of dust nuisance during the construction period has been submitted to and approved in writing by the Department. Development shall be carried out in accordance with the approved Plan.; C8 Silt Management Plan, surface water runoff scheme and storage management: i) a silt management plan; ii) measures to control the storage, handling and disposal of polluting material; iii) construction of a sustainable drainage system or filtering of silt laden run-off; iv) measures to ensure that work to existing surface water features does not cause erosion.; C9 Drainage: Details of surface water drainage works shall be submitted to and approved in writing by the Department... provide information about the design storm period and intensity, the method employed to delay and control the surface water discharged from the site and the measures taken to prevent pollution... include a timetable for implementation... provide a surface water management and maintenance plan for the lifetime of the development. Development shall be carried out in accordance with the approved details.