Planning Approval Decision Notice
Isle of Man Town and Country Planning Act 1999
The Town and Country Planning (Development Procedure) Order 2005
Arch-Tec (IOM) Ltd The Architectural Studio Stanley House Lord Street Douglas IM1 2BF
In pursuance of powers granted under the above Act and Order the Department of Infrastructure does hereby APPROVE the following application made on behalf of:
Name: Mr & Mrs Richard Huxham Proposal: Alterations and extensions to dwelling house at: Ballamoar Beg Main Road Ballaugh Isle Of Man IM7 5EF
which was considered on 28th February 2011, subject to compliance with the conditions specified below.
Date of Issue: 1st March 2011
Murray House Mount Havelock Douglas
Mrs C Dudley Deputy Secretary to the Planning Committee
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This approval relates to the alterations and extensions to dwelling house as proposed in the submitted documents and drawings AT 1064.1 and AT 1064.2 all received on 22nd July 2010.
- The external finishes of the extension must match those of the existing building in all respects.
NOTE There must be No discharge of surface water (including that from roofs and paved areas) from this proposed development to any foul drainage system(s) so as to comply with the requirements of the Isle of Man Water \& Sewerage Authority, Drainage Division and the Sewerage Act 1999.
NOTE It is noted that the surface water from the property is to be discharged via a soakaway. The use of soakaways are subject to Building Control approval and if this approval is not granted, the Drainage Division would not give permission for the discharge of surface water into the existing foul system and an alternative means of disposal would have to be sought.
NOTE The applicant is requested to supply the Division a copy of any Building Control Application in relation to the surface water discharge from this development.
This decision was made by the Senior Planning Officer in accordance with the authority delegated to her under Article 3(13) of the Town and Country (Development Procedure) Order 2005.
Guidance Note
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department's website www.gov.im/transport/planning/plan/applications/decision.xml
Please note that a copy of the Officer's report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.