Application No.: 25/91089/B Applicant: Mr & Mrs David and Shan Fisher Proposal: Replacement of existing lean to with double storey extension to northeast elevation, alteration to vehicular access Site Address: Kimmeragh Ballafesson Road Port Erin Isle Of Man IM9 6TX Senior Planning Officer: Jason Singleton Expected Decision Level: Officer Delegation Recommended Decision: Permitted Date of Recommendation: 05.02.2026 _________________________________________________________________
C : Conditions for approval N : Notes attached to conditions
Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals.
The Applicant is reminded that a S109 Highway agreement will be required for the installation of a dropped kerb vehicular access onto the highway.
This application has been recommended for approval for the following reason. The proposals would comply with Strategic Policy 5, Spatial Policy 4, General Policy 2 and Environment Policy 42 of the Isle of Man Strategic Plan (2016).
Plans/Drawings/Information;
This decision relates to drawings ans supporting information received on 12 December 2026, referenced;
_________________________________________________________________ Right to Appeal
It is recommended that the following organisations should NOT be given the Right to Appeal: DOI Highway Services - No Objection with condition Local Authority - Support proposal
It is recommended that the owners/occupiers of the following properties should be given the Right to Appeal as they have submitted an objection that meets the specified criteria: Lhag Sumark Ballafesson Road Port Erin
_________________________________________________________________ Officer’s Report
1.0 THE SITE - 1.1 The site is the residential curtilage of an existing dwelling, Kimmeragh which is one of three dwellings which sit somewhat on their own on the south eastern side of the Ballafesson Road. The two dwellings which lie to the south west are "Mizpah", closest to the application property, and "The Gables" further to the south west. The land to the rear is agricultural fields. - 1.2 The existing dwelling began as a detached dormer bungalow circa 1970's that has seen various extensions added to the original built form and has an established flat roof dormer roof extension to the rear roofscape and a single storey rear extension off the existing rear elevation. As such much of the original character here in terms of the rear elevation has been altered & extended but the front elevation facing the street scene remains as is. - 1.3 Internally the property, contains a granny flat and is noted this is used by an elderly relative. The existing lean-to extension accommodates a kitchen and leads to a lounge with its own staircase to a bedroom above.
2.0 THE PROPOSAL - 2.1 This application proposes to demolish an existing lean to extension on the side (north) elevation and in its place the erection of a two story extension, measuring a footprint of 4.5m wide and 7.1m deep (the width of the property) and a lower ridge height than the built form it is attached to. Internally the space created would accommodate a new kitchen diner and a large bedroom with ensuite and dressing room. - 2.2 The proposed extension would have the appearance and finished to match the host property (painted rendered walls and double roman tiled roof) with the rear elevation of the
3.0 PLANNING POLICY - 3.1 In terms of local plan policy, the application site is within an area recognised as being predominantly residential use under the Area Plan for the South and within the settlement boundary of Ballafesson on Map 7 (Port Erin / Port St Mary). The site is not within a conservation area or within an area identified as being at flood risk. - 3.2 The Isle of Man Strategic Plan 2016 contains the following policies that are considered specifically material to the assessment of this application; Strategic Policy
3.3 Paragraph 8.12.1 of the Isle of Man Strategic Plan 2016 states: "As a general policy, in built up areas not controlled by Conservation Area or Registered Building policies, there will be a general presumption in favour of extensions to existing property where such extensions would not have an adverse impact on either adjacent property or the surrounding area in general." - 3.4 The Residential Design Guidance (2021) provides advice on the design of new houses and extensions to existing property as well as how to assess the impact of such development on the living conditions of those in adjacent residential property. Specific information is given in Section 4.7.2 for the design of flat roof extension where the department seeks for improved designs incorporating architectural detailing and provides examples of good and bad design. Generally, design of the flat roof extensions should utilise parapet walls including architectural detailing. It is generally encouraged that applicants explain the reasons why a flat roof design was considered and chosen.
4.1 The application site benefits from the following approvals; 01/01369/B - Alterations and extensions to dwelling including conversion of garage to additional living accommodation and enlargement of existing vehicular access and driveway 12/00264/B - Erection of a dormer extension to dwelling
Approved by Planning Committee.
5.1 Arbory and Rushen Commissioners (03.02.2026) support the proposal.
5.2 Highways Services commented (23/01/26) No objection: "Highway Services HDC has reviewed the uploaded information for application 25/91089/B dated 15 Jan 26 online and can comment that the Applicant has addressed HDC previous comments and therefore HDC now does not oppose (DNOC) the application subject to conditions on access, parking and vehicle hardstanding to be bound and consolidated. A S109 highway agreement will be required for the closing (to full height footway) and opening (to dropped kerb vehicular access) of the accesses". - 5.3 Lhag Sumark Ballafesson Road Port Erin (23/12/25) "I wish to dispute the planning application on Kimmeragh to change the location of their driveway. We live across this road in Lhag Sumark. Where they plan to have their drive is adjacent to where we park our two cars on the public road. This is the only safe place to actually park so moving the drive entry will take this from our home. I know it is public but it is all the parking there is. We do not mind the extension, just not the moving of the driveway".
6.1 The fundamental issues to consider in the assessment of this planning application are;
PRINCIPLE
6.2 The application site is located in an area zoned for residential development and is situated within a defined settlement, where the general principle would be accepted and further supported though Paragraph 8.12.1 of the SP, where there is a general presumption in favour of extensions, which; "would not have an adverse impact on either adjacent property or the surrounding area in general". As such the principle of development to this property would meet the criteria within Stp2 and Sp4. DESIGN & VISUAL IMPACT - 6.3 The demolition of the existing lean-to extension would be acceptable as this contributes no architectural merit to the property. In its place and slightly larger, the proposed extension at the side (north) in a two storey height and roof pitch to match that of the existing, would be acceptable form of development for increasing the floor area for residential use. The use would remain as a granny flat, albeit larger but still is connected internally to the main dwelling. The proposed extension would be introducing a larger built form on this side elevation and in terms of size (footprint) and height (two storey) but it would be considered proportionate to the side / front elevation that's designed to serve that specific purpose in terms of residential accommodation attached to the host dwellinghouse. Nevertheless, these proposals would be insignificant when compared to the gravitas of the first floor extension that was approved at appeal decision under 22/01538/B as shown on dwg ref; 1565-57. - 6.4 In terms of roof coverings, this proposal would incorporate the use of a pitched roof with a dormer in the rear elevation to echo that of the existing level of dormer in the rear roof scape. When putting this in context with this site, it can be seen that the design of this extension being proposed here has been designed to complement the main dwelling and has incorporated within its design other elements to enhance its appearance, in terms of use of materials and fenestration design and detailing, which can be an acceptable approach. - 6.5 When viewing the proposed extension, it would not be readily visible from a public vantage point, mainly from the public highway (Ballafesson Road) albeit from a distance. The road side boundary/ curtilage of the property is tall evergreen hedging ameliorating any visual impact from this section of the pavement when passing and the rear aspect is not be visible from the front elevation (streetscene) as the majority of the dwelling house screens the rear. - 6.6 As such, any views of the proposals from the public highway, would be read within the contact of the property and the residential curtilage and would not appear out of character. On
7.1 The planning application would be an acceptable form of development within a defined residential area that has been designed to ensure that it would not harm the host dwelling in terms of visual appearance over and above the existing levels nor would the use and enjoyment of neighbouring properties amenities be affected by the proposals.
7.2 As such the proposals would comply with Strategic Policy 5, Spatial Policy 4, General Policy 2 and Environment Policy 42 of the Isle of Man Strategic Plan (2016). The application is therefore recommended for approval. - 8.0 RIGHT TO APPEAL AND RIGHT TO GIVE EVIDENCE
8.1 The Town and Country Planning (Development Procedure) Order 2019 sets out the process for determining planning applications (including appeals). It sets out a Right to Appeal (i.e. to submit an appeal against a planning decision) and a Right to Give Evidence at Appeals (i.e. to participate in an appeal if one is submitted).
8.2 Article A10 sets out that the right to appeal is available to:
8.3 Article 8(2)(a) requires that in determining an application, the Department must decide who has a right to appeal, in accordance with the criteria set out in article A10. - 8.4 The Order automatically affords the Right to Give Evidence to the following (no determination is required):
I can confirm that this decision has been made by a Principal Planner in accordance with the authority afforded to that Officer by the appropriate DEFA Delegation and that in making this decision the Officer has agreed the recommendation in relation to who should be afforded interested person status and/or rights to appeal.
Decision Made : Permitted Date: 05.02.2026 Determining Officer
Signed : C BALMER Chris Balmer Principal Planner