Alterations, erection of extension and reduce size of approved garage (07/01321/B), Ballacoraige House Cronk Road
BALLAUGH
NOTE 1
08/00844/B
Extension to driveway, Poyl Breck East Baldwin
BRADDAN
NOTE 1
08/00828/B
Widen vehicular access and driveway, 7 Bray Hill
DOUGLAS
NOTE 1
08/00845/B
Outside seating areas, Legends Peveril Building Peveril Square
DOUGLAS
NOTE 1 & SPECIAL NOTE
08/00833/B
Erection of a tractor shed, Villa Rhenny Greeba Rhenny Mooar Lane Greeba
GERMAN
NOTE 1
08/00865/B
External alterations, Yn Shenn Oik Postagh Old Laxey Hill
LAXEY
NOTE 1
08/00829/A
Approval in principle for the erection of a dwelling, Land Adjacent To Merrigal House Ballavitchel Road Crosby
MAROWN
NOTE 1
08/00836/B
Extension to dwelling, Little Trees Main Road Glen Vine
MAROWN
NOTE 1
08/00835/C
Change of use of garage into a beauty salon, Primrose Lodge Slieau Lewaigue Lewaigue
MAUGHOLD
NOTE 1 & 2
08/00842/B
Alterations and extensions to dwelling (comprising amendments to the development approved under PA 07/00752B), Springfield House 9 Boollushag Ballajora
MAUGHOLD
NOTE 1
Light-neill Lectraghys manningh
PO Box 177 • Douglas • Isle of Man • IM99 1PS • British Isles Tel + 44 (1624) 687766 • Fax + 44 (1624) 687612 • e-mail [email protected]
Planning Applications
The Authority wish to express their interest in the following planning applications, and request that a condition of planning be that the applicant must contact the Authority.
08/05/2008
Standard Reply Notes for Planning Applications:
Notes
There are Underground Cables/Overhead Lines present in the area indicated in you Planning Application. Please contact our Network Operations Department, Manx Electricity Authority, (Tel. 687687) to discuss working practices around Cables and Overhead Lines which may be required to be diverted before any work can be carried out on site.
Contact the M.E.A. for Electrical Site Safety 5 documents, (Tel. 687766), before any work is carried out on site. All work to be carried out with reference to Health and Safety Executive Guidance Notes HS(G)47 \& GS6.
Contact the M.E.A. Planning Department (Tel. 687781), to discuss the electricity supply for this application.
If the applicant requires to connect any private generation to the M.E.A. electricity supply they must make an application to the M.E.A. as soon as possible. The implications due to the location of any such installations need early consideration and they must conform to the appropriate standards as set down for embedded generation.
Contact the M.E.A. Planning Department (Tel. 687781).
* Special Note
Please note MEA requires 24 hours unrestricted access to the cables in the Public Highway and MEA will not be liable for any loss of income caused to the applicant as a result of its statutory works.
Copyright in submitted documents remains with their authors. Request removal