Planning Approval Decision Notice
Town and Country Planning Act 1999
The Town and Country Planning (Development Procedure) Order 2005
Mr M Smedley Fromanteel Ltd 2 Arragon Mooar Cottages Church Road Santon Isle of Man
In pursuance of powers granted under the above Act and Order the Department of Local Government and the Environment does hereby APPROVE the following application made on behalf of:
Name: Mr M Smedley Proposal: Creation of six windows to side and rear elevations and formation of internal mezzanine floor at: Unit B7 Balthane Industrial Estate Balthane Ballasalla Isle of Man
which was considered on 1 May 2007, subject to compliance with the conditions specified below.
Date of Issue: 8 May, 2007 Murray House Mount Havelock Douglas
Secretary Planning Committee
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This permission relates to the installation of windows and the creation of a mezzanine floor all as shown and described in drawings reference 30A and D.580/10 received on 26th January, 2007 and 15th February, 2007 respectively.
NOTE The applicant is advised to contact the Manx Electricity Authority Planning Department (Tel. 687781), to discuss the electricity supply for this application.
This decision was made by the Director of Planning and Building control in accordance with the authority delegated to him under Article 3(13) of the Town and Country (Development Procedure) Order 2005.
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department’s website www.gov.im/dlge/planning/plan
Please note that a copy of the Officer’s report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.
Applicant/Agent