Drainage Division Consultation Response
Department of Transport
Rhyenn Arraghey
Direct Line: (01624) 69... Fax: (01624) 69... e mail – [email protected]
The Secretary, Planning Committee Department of Local Government & the Environment, Murray House, Douglas.
19 May 2005
Dear Sir,
PA 05/0760/B – Construction of a front porch and erection of a detached storage building, Riverside Cottage formerly, That'Ll Do Bridge Road Ballasalla, Malew.
The plans for the proposed development have been inspected and the Drainage Division of the Department of Transport requests that the following comment(s) be passed to your Planning Committee: -
NO OBJECTION In principle subject to: -
There must be NO discharge of surface water (including that from roofs and paved areas) from this proposed development to any foul drainage system(s) so as to comply with the requirements of the Department of Transport Drainage Division and the Sewerage Act 1999.
The application states that the surface water from the proposed development is to be discharged to the “existing drainage”. If this “existing drainage” discharges (directly or indirectly) to the foul sewerage system then it should be noted that an alternative means of surface water disposal must be provided.
There shall be no connection of the storage building to the public foul sewerage system without the written permission of the Drainage Division.
In the event that this application is approved I should be grateful if these comments could be incorporated in the approval notice. Yours faithfully, C.C. Applicant/Agent