Loading document...
| Application No.: | 13/00213/B |
| Applicant: | Mr Gary Leonard Holdaway |
| Proposal: | Creation of a pedestrian access (retrospective) |
| Site Address: | 2 Ballanoa Meadow Santon Isle Of Man IM4 1HQ |
| Case Officer: | Miss Laura Davy |
| Photo Taken: | |
| Site Visit: | |
| Expected Decision Level: | Officer Delegation |
Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development:
a) Is in accordance with the design brief in the Area Plan where there is such a brief; b) Respects the site and surroundings in terms of the siting, layout, scale, form, design and landscaping of buildings and the spaces around them; c) Does not affect adversely the character of the surrounding landscape or townscape; d) Does not adversely affect the protected wildlife or locally important habitats on the site or adjacent land, including water courses; e) Does not affect adversely public views of the sea; f) Incorporates where possible existing topography and landscape features, particularly trees and sod banks; g) Does not affect adversely the amenity of local residents or the character of the locality; h) Provides satisfactory amenity standards in itself, including where appropriate safe and convenient access for all highway users, together with adequate parking, servicing and manoeuvring space;
i) Does not have an unacceptable effect on road safety or traffic flows on the local highways; j) Can be provided with all necessary services; k) Does not prejudice the use or development of adjoining land in accordance with the appropriate Area Plan; l) Is not on contaminated land or subject to unreasonable risk of erosion or flooding; m) Takes account of community and personal safety and security in the design of buildings and the spaces around them; and n) Is designed having due regard to best practice in reducing energy consumption.
Recommended Decision: Permitted
Date of Recommendation: 26.03.2013
C : Conditions for approval N : Notes attached to conditions R : Reasons for refusal
This permission relates to the creation of a pedestrian access as shown in drawings location plan, site plan, elevation and floorplan/site plan received 19th February 2013.
I confirm that this decision accords with the appropriate Government Circular delegating functions to Director of Planning and Building Control / Development Control Manager/ Senior Planning Officer.
Decision Made: Permitted Date: 26/3/13
Signed: A. Nour Anthony Holmes Senior Planning Officer
Signed: _________________________ Michael Gallagher Director of Planning and Building Control
Signed: _________________________ Sarah Corlett Senior Planning Officer
Signed: _________________________ Jennifer Chance Development Control Manager
Copyright in submitted documents remains with their authors. Request removal
View as Markdown