Loading document...
Application No.: 25/10015/AIR Applicant: Mr Mike Davies Proposal: Information in relation to condition 7 of PA 23/01407/B detailing the dust management plan Site Address: Land West Of Glenfaba Road Fields 311835, 311836 And 311785 Glenfaba Road Peel Planning Assistant: Charlotte Gatt Recommended Decision: Permitted Date of Recommendation: 18.03.2025 Notes for Approval N : Notes attached to conditions NOTE. In this instance of the submitted documentation and after consultation with the case officer confirming that they are happy with the level of detail, it is deemed sufficient to achieve the desired outcome and would be considered satisfactory for the planning condition 7 of application 23/01407/B, under the understanding that the development shall not be carried out unless in accordance with the approved details. ## Plans/Drawings/Information; This decision hereby approved relates to documents submitted to the Department titled: APPLICATION FORM and CONDITION - C7 DUST MANAGEMENT PLAN recorded as being electronically received on 10.01.2025
1.0 Description - 1.1 The proposed application 23/01407/B for the construction of a new Sewage Treatment Works and creation of new vehicular access was approved at appeal on 16.07.2024 subject to 19 conditions, some of which required submission of additional information prior to the commencement of works. - 1.2 This report is specific to Condition (7) which the applicants are seeking to satisfy. - 1.3 Specific wording of the condition is as follows:
No works shall commence, including any works of site clearance and ground preparation, until a scheme for the mitigation of dust nuisance during the construction period has been submitted to and approved in writing by the Department. Development shall be carried out in accordance with the approved Plan.
REASON: In order to protect air quality for those living and working in the vicinity of the site.
2.0 Proposal - 2.1 The applicants have submitted details providing information for the mitigation of dust nuisance during the construction period along with a duly completed AIRC form on the 10.01.2025. - 2.2 The report outlines the following: Dust Management Plan (DMP) To combat the effects of dust inhalation, construction dust control regulations they will direct a three-pronged approach: Assess, Control, and Review. The Site Manager/s and Supervisors will be:
The site manager will be responsible for the implementation of this DMP and for ensuring that control measures in place are adhered to. In the absence of the site manager, responsibility of ensuring implementation of the DMP will be delegated to a suitably experienced site operative.
All staff members will receive the necessary training to deliver the dust suppression measures detailed within this DMP. Site procedures will be communicated to staff via site inductions and toolbox talks. Should the need arise to implement new dust suppression measures on site, additional training will be given to site staff to ensure they remain competent.
The DMP is to be reviewed on a monthly basis or in response to a complaint, environmental near misses or as a result of changes to activities on the site.
Regular inspections/ visual monitoring to be undertaken at the boundaries with all potential receptors
Vehicles entering and leaving the site with mud on wheels and tracking mud/dust off the site. On site vehicle movements on unpaved haul routes:
3.0 Consultation - 3.1 Department's Environmental Protection Unit were also consulted for advice on the satisfaction of condition. The advice received 18.03.2025, after their review of the submitted documents, concludes that they are pleased to confirm that the information satisfies the relevant clauses.
I can confirm that this decision has been made by the Head of Development Management in accordance with the authority afforded to that Officer by the appropriate DEFA
Delegation and that in making this decision the Officer has agreed the recommendation in relation to who should be afforded Interested Person Status
Decision Made : Permitted Date : 18.03.2025 Determining officer
Signed : S BUTLER Stephen Butler Head of Development Management