2 December 2024 · Acting Head of Development Management (Abigail Morgan); issued by Director of Planning and Building Control (J Chance)
Cable And Wireless, Sure Cable And Wireless Site 088, Shipyard Road, Ramsey, Isle Of Man, IM8 3dt
Sure (Isle of Man) Ltd applied to redevelop their existing mobile telecom site on a small 7.4m x 3.6m parcel within an industrial area on Shipyard Road, Ramsey, by replacing the current 15.3m solid monopole with a 15m high slimline lattice tower of galvanised grey finish, supporting multiple panel antennas, AAUs, RRUs,…
Click a button above to find applications similar to this one.
See how this application compares to similar ones — policies, conditions, and outcomes side by side.
The officer balanced the 'need' for upgraded telecom infrastructure under Infrastructure Policy 3 against environmental impacts, finding the proposal compliant as it modernises an existing site to sup…
Strategic Policy 2 - Priority for new development to identified towns and villages
Requires new development in named service centres like Ramsey. Officer assessed site within Ramsey settlement boundary and industrial zoning, suitable for telecom upgrade serving residential/business demand.
General Policy 2
Covers design (b), visual amenity (c), residential amenity (g), public health (m). Proposal's slimline design, colouring, distance from homes (>65m), and ICNIRP compliance met tests; limited visual impact acceptable in industrial context.
Environmental Policy 22
Safeguards environment/amenities. No nuisance (noise/light), no harm to neighbours; visual impact limited and outweighed by telecom benefits.
Time limit
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice. Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals.
Removal of redundant equipment
Unless otherwise approved in writing by the Department, any telecommunications cabinet, mounted equipment or telecommunications structure must be removed from the land on which it is situated, within 6 months of it no longer being required for telecommunications purposes, and such land must be restored to its condition before the development took place, so far as is practicable. Reason: To ensure that any redundant infrastructure is removed and to comply with Strategic Plan Infrastructure Policy 3.
Details of antennas/dishes/remote radio heads
The development hereby approved shall not commence until further details of the antennas, dishes and remote radio heads to be installed have been submitted to and approved in writing by the Department. The development shall not be carried out unless in accordance with the approved details and shall be retained as such thereafter unless a variation or alteration is permitted under Schedule 2 of the Town and Country Planning (Telecommunications) Development Order 2019 (or any alteration/replacement of that order). Reason: To ensure appropriate use of the mast for telecommunication equipment.
Fencing/walling/gates as approved plans
Notwithstanding the provisions of the Town and Country Planning (Permitted Development) Order 2012 (or any amendment or replacement of that order) no fencing, walling or gates shall be erected at the site other than as shown on the approved plans shall be erected. Reason: to ensure the development is carried out in accordance with the approved plans in the interests of the visual amenity of the area.
Mast height limit
The proposed telecoms mast and affixed communication equipment here by approved shall be no higher than the stated 15m when measured from the concrete base as shown on plan referenced; IoM_35/014 Rev-D. REASON To ensure the mast height is installed in accordance with the approved plans.
Colour antennas/dishes/RRU to match mast
The proposed antennas, dishes and RRU shall be coloured to match the slimline lattice mast to which they are affixed and retained in perpetuity. REASON: To mitigate any visual impact.
Remove temporary works
The temporary work area / fencing as shown on the drawing entitled, "Temporary Mast and Temporary Work Area" Ref; IOM_35/015_A shall be removed from the site within 2 weeks of the new mast being brought into use. Reason: to prevent the retention on site of temporary works which would be detrimental to the visual amenity of the area.
no objection
No Objection
Highway Services HDC has no interest in the application as it has no highway impact, and Ramsey Town Commissioners have no objection to the proposed redevelopment of the Sure Mobile site.
Highway Services HDC
No ObjectionHighway Services HDC has no interest (NHI) in: 24/91146/B
Ramsey Town Commissioners
No ObjectionRamsey Town Commissioners have no objection to this proposal.