Loading document...
Application No.: 19/00023/B Applicant: Department Of Infrastructure Proposal: Alterations in connection with conversion of existing storage area to open plan office space, installation of mezzanine floor to provide additional office space, formation of window and door openings, provision of external fire escape and entrance canopy and partial demolition of redundant rear building to create additional parking and pedestrian access Site Address: Stores And Workshops Hills Meadow Industrial Estate Douglas Isle Of Man IM1 5EA Planning Officer: Mr Nick Salt Photo Taken: 01.02.2019 Site Visit: 01.02.2019 Expected Decision Level: Officer Delegation Recommended Decision: Permitted Date of Recommendation: 02.04.2019 _________________________________________________________________
C : Conditions for approval N : Notes attached to conditions
Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals.
Reason: In the interests of the safety of site users and overall highway safety in accordance with General Policy 2 and Transport Policy 7 of the Isle of Man Strategic Plan 2016.
Reason: To prevent a future separation of the site or further demand for office space in an industrial area.
This permission relates to the following plans and drawings, date stamped received on 10th January 2019:
And 1611-001 Rev B date stamped received on 11.03.19. _______________________________________________________________
Additional Persons
It is recommended that the owners/occupiers of the following properties should be given Interested Person Status as they are considered to have sufficient interest in the subject matter of the application to take part in any subsequent proceedings and are not mentioned in Article 6(4):
BHW Print Group Limited, Hills Meadow, Douglas as they satisfy all of the requirements of paragraph 2 of the Department's Operational Policy on Interested Person Status (July 2018). _____________________________________________________________________________
1.0 SITE - 1.1 The application site, as identified in red, is the existing stores, workshop and their curtilage located to the south of the Highway and to the west of the Industrial estate. The premises are within Hills Meadow Industrial Estate and currently operated by Department of Infrastructure as workshops and storage. - 1.2 The adjacent building to the west is operated by Department of Education and Children as a new Aerospace Precision Engineering Facility providing educational and training support for the local aerospace and precision engineering industry to address key strategic training needs. - 1.3 Within the wider estate there are numerous operators ranging from stationers and printers, scrap car breakers, vehicle repairs and part of the University College training rooms for engineering.
2.0 PROPOSAL - 2.1 Proposed is the conversion of an existing storage area into open-plan office space, and the installation of a replacement mezzanine floor within the same area to provide further office space. The redundant workshops at the rear of the building are to be partly demolished to provide increased car parking from 16 spaces to 39 spaces, and improvements to vehicular
3.0 PLANNING HISTORY - 3.1 89/01913/B - Alterations to disused carpet factory to form building maintenance depot and workshops. Approved. - 3.2 11/00945/D - Erection of information signage. Approved. These were internal information and directional signs. - 3.3 The adjacent building to the west was operated as office and storage facility under approval 11/00588/C which was approved at appeal for office and storage facilities. The applicant was the IOM Post Office for their IMS (Integrated Mailing Services) and an exception was made as the office aspect was for data capture that would not normally be found within town centres and a degree of leniency on the interpretation of the policies was given in this case. - 3.4 More recently, approval was granted under 18/00600/B for a similar proposal as the current. This would also have seen similar external works, and the use of the stores/workshop for offices as well as an increased parking provision. Conditions were attached to this approval:
4.0 PLANNING POLICY - 4.1 The application site is within an area allocated as light industrial by the Douglas Local Plan 1998 (Map 2).The site is also identified as being within the Douglas flood risk area (MUA Map 1 of 4) from river and tidal flooding for a 1/100 year event. - 4.2 The draft Area Plan for the East 2018, Map No.5 defines this area as Riverside Gateway but includes this section to the south of Peel road as part of Draft Douglas Town Centre Boundary.
4.3 The Isle of Man Strategic Plan 2016 contains the following policies that are considered specifically material to the assessment of this application; - 4.4 General Policy 2 (GP2) (in part) Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development:
4.5 Paragraph 9.2.3 (in part); "light industrial building" means an industrial building (not being a special industrial
building) in which the processes carried on or the machinery installed are such as could be carried on or installed in any residential area without detriment to the amenity of that area by reason of noise, vibration, smell, fumes, smoke, soot, ash, dust or grit, or undue generation of traffic or parking of vehicles; the use of light industrial buildings for research and development of products or processes is permitted by the Town and Country Planning (Permitted Development) Order 2005.
4.6 Business Policy 5 indicates that; On land zoned for industrial use, permission will be given only for industrial development or for storage and distribution; retailing will not be permitted except in specific circumstances. - 4.7 Business Policy 7 New office floor space should be located within town and village centres on land which is zoned for the purpose on the appropriate area plan; exceptionally, permission may be given for new office space
4.8 Transport Policy 7 The Department will require that in all new development, parking provision must be in accordance with the Department's current standards. - 4.9 Environment Policy 10 Where development is proposed on any site where in the opinion of the Department of Local Government and the Environment there is a potential risk of flooding, a flood risk assessment and details of proposed mitigation measures must accompany any application for planning permission. The requirements for a flood risk assessment are set out in Appendix 4. - 4.10 Environment Policy 13 Development which would result in an unacceptable risk from flooding, either on or off-site, will not be permitted.
5.1 DoI Highway Services initially objected to the application (06.03.19) for the following reasons:
"Highway Services does not oppose the application subject to a planning condition for the proposed parking layout to be provided and permanently maintained prior to occupation of the development.
The applicant has clarified the discrepancy in the floor areas previously raised. The parking standards in 'The Isle of Man Strategic Plan 2016' require 1 space per 15sqm for offices outside the town centre, and 1 space per 50sqm for general industrial use which is considered appropriate for workshops and storage areas. The revised location and site plan (drawing no. 1611-001 revision B) shows the changes in floor areas resulting from the development and the corresponding change in the parking demand, although there would be a reduction in 5 rather than 4 spaces for the demolished workshop (4.5 spaces should be rounded up to 5 rather than down to 4). 17 additional parking spaces would therefore be required to serve the development and 23 would be provided which is acceptable.
There would be sufficient aisle widths to allow cars to manoeuvre in and out of the spaces and the aisle adjacent to space nos. 26, 32, 34, 35 and 39 has been extended as previously requested to facilitate easy access to those spaces. The parking spaces would be at least 2.5m x 5m to comply with the minimum bay size in the 'Manual for Manx Roads' design guide. As mentioned in the former highway response, there should be no highway issues as a result of the site access arrangements or traffic that would be generated by the development."
5.3 Douglas Borough Council have no objections to the application (25.01.19). - 5.4 Manx Utilities (Flooding) have stated the following (06.02.19): "The above application proposes alterations to a property within a fluvial flood zone as per the attached flood map. This map indicates the predicted extent or fluvial flooding for a 1 in 100 year return plus climate change. It is recommended that the proposed alterations consider introducing flood resilience measures into their plans. Such measures include ensuring that all electric points are located high up; tiling of floor coverings; cement sand render; adding salt additives to lime plaster; adding waterproof grout; installing non-return valves on any foul or surface water drains etc." - 5.5 A comment has been submitted from a business on the site (BHW Print Group Limited) immediately adjacent the site stating concern about parking in a congested area and asking for further information on the provision for on and off site parking and policing measures to be used (21.01.19).
6.1 The key considerations in the consideration of this application are:
appropriate for the area, in compliance with GP2 and TP7. A condition on approval suggested by DoI Highways for the proposed parking layout to be provided and permanently maintained prior to the occupation of the development should be added.
7.1 Whilst the proposal could be considered contrary to the land use designation as set out in the Douglas Local Plan 1998, a very similar proposal (18/00600/B) was brought to Planning Committee and approved on 1st October 2018. It is regarded that the principle of the office use on this site has been deemed acceptable by the Committee, and that, in accordance with DEFA Standing Order No.2018/01 3(1) this application should be determined by a senior planner through delegated powers. - 8.0 CONCLUSION
8.1 For the above reasons, it is concluded that the planning application is acceptable in principle, would not harm the use and enjoyment of neighbouring properties or the highway network and would comply with aforementioned planning policies of the Isle of Man Strategic Plan 2016 and is recommended for approval. - 9.0 INTERESTED PERSONS STATUS
9.1 By virtue of the Town and Country Planning (Development Procedure) (No 2) Order 2013 Article 6(4), the following persons are automatically interested persons:
I can confirm that this decision has been made by a Principal Planner in accordance with the authority afforded to that Officer by the appropriate DEFA Delegation.
Decision Made : Permitted Date: 12.04.2019 Determining officer
Signed : S CORLETT Sarah Corlett Principal Planner
Copyright in submitted documents remains with their authors. Request removal
View as Markdown