Loading document...
Application No.: 19/00141/B Applicant: Ashwolfe Ltd Proposal: Conversion and erection of extension of existing buildings to form cafe (Class 3) with associated office and retail (Class 1) Site Address: Workshop Orchard Street Port Erin Isle Of Man IM9 6AJ Senior Planning Officer: Mr Thomas O'Connor Photo Taken: 03.04.2014 Site Visit: 03.04.2019 Expected Decision Level: Officer Delegation Recommended Decision: Permitted Date of Recommendation: 29.04.2019 _________________________________________________________________
C : Conditions for approval N : Notes attached to conditions
Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals.
Reason: In the interests of maintaining and enhancing the character and appearance of the site.
Reason: In the interests of maintaining and enhancing the character and appearance of the site.
This decision relates to Site Location Plan Scale 1: 1250; Site Plan Scale 1:500; Drawing Sheet 1 Existing Plans and Elevations and ; Sheet 2 Proposed Plans and elevations submitted in support of the application dated stamped and received on 13th February 2019.
_______________________________________________________________ Interested Person Status – Additional Persons
It is recommended that the owners/occupiers of the following properties at:
Should not be given Interested Person Status as these addresses are not within 20m of the application site and the development is not automatically required to be the subject of an EIA by Appendix 5 of the Strategic Plan, in accordance with paragraph 2B of the Policy. These addresses are remote from and do not adjoin the application site and the occupants/owners have not explained how the development would impact the lawful use of land owned or
As they do not refer to the relevant issues in accordance with paragraph 2C of the Policy and as they have not explained how the development would impact the lawful use of land owned or
1.0 THE APPLICATION SITE - 1.1 The site consists of a detached two storey commercial building with an associated separate detached single storey outbuilding separated from the main building by a through driveway within a commercial area of shops and offices close to the centre of Port Erin.
2.0 THE PROPOSAL - 2.1 This application seeks to undertake a conversion and extension to the existing buildings to form a café (Class 3) with associated office on the upper floor with a retail outlet on the ground floor. In order to achieve this, it is proposed to extend the main building in the form of a two storey addition to incorporate the side outbuilding into a single structure and extend from this out to the rear. The resulting structure would consist of: the following structural changes to the building.
2.2 As indicated above, the internal alterations would consist of:
3.0 PLANNING HISTORY - 3.1 None recorded for this site
4.1 In terms of land use designation the application site is located within a wider area of land that is designated as predominantly commercial and retail under the Isle of Man Planning Scheme (Development Plan) Provisional Order 1982. - 4.2 General Policy 2 of the Isle of Man Strategic Plan 2016 is more specific in land use zoning and states: "Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development:
and the spaces around them; and
4.3 Spatial Policy 2: Outside Douglas development will be concentrated on the following Service Centres to provide regeneration and choice of location for housing, employment and services
5.1 Port Erin Commissioners in their letter of 12th March 2019 have resolved to support the application. - 5.2 Highway Services: There is an existing vehicular access to the site between the 2 existing buildings which is served by dropped kerbs. The proposed extension would remove this vehicular access by extending and joining the 2 buildings. There is no room for parking on the site frontage as any parked cars would overhang and illegally obstruct the adjacent public footway. A S109A Highway Agreement would therefore not be granted to legally extend the dropped kerbs across the full site frontage to facilitate vehicular access/parking. The front boundary wall could therefore be retained if preferred, and should it be removed it must not damage the adjacent highway signage. There is no parking standard for the existing workshop use. The proposal would increase the site parking demand but as it is located in the town centre where public car parking is available this is deemed acceptable. Highway Services does not oppose the application. - 5.3 Neighbours: Overall, four (4) letters have been received from local residents and interested parties objecting to the proposal. These objections can be summarised as follows:
6.1 The proposal would result a change in the use of the premises from a commercial workshop to retail and café use (Class 3) orientated to service the visitor economy of the town. In this respect, the site occupies a central location close to main bus stops in Bridson Street and the steam railway station. Shops, the promenade and beach are all within walking distance of the site with the museum located across the street within what is a central location within the tourist footfall area. Spatial Policy 2 identifies service centres areas outside Douglas, such as Port Erin where development will be concentrated to provide regeneration and choice of location for housing, employment and services. - 6.2 The proposal would seek to re-use a redundant building to a function that is relevant to the current visitor, shopping and tourist use within the locality serving both the visitor economy and providing the potential for the employment of local [people in the area. In these respects, the proposal would comply with the requirements of Spatial Policy 2 of the Isle of Man Strategic Plan 2016. - 6.3 Though the site does not provide for dedicated parking spaces within the site, its customer base is likely to be more pedestrian based with the footfall generated in part by visitor numbers that arrive by public transport such as bus and rail and who would be in Port Erin as a tourist destination and visiting a range of shops and cafes within the town centre. There is disk controlled on-street parking available nearby on Main Road and Church Road available for all visitors to the town as well as off street parking also available in Orchard Road. Given the context of the use of these premises as a visitor attraction within a busy town centre of similar attractions, the proposal is unlikely to generate sufficient additional vehicular parking on its own, that would materially increase parking congestion on the street or, indeed, encroach upon the private parking areas used by local businesses or residents. As such, the proposal would comply the requirements of General Policy 2 (g) in not adversely the amenity of
7.0 RECOMMENDATION 7.1 It is recommended that the planning application be approved 8.0 INTERESTED PERSON STATUS - 8.1 By virtue of the Town and Country Planning (Development Procedure) (No 2) Order 2013, the following persons are automatically interested persons:
With effect from 1 June 2015, the Transfer of Planning & Building Control Functions Order 2015 amends the Town and Country Planning Act 1999 to give effect to the meaning of the word 'Department' to be the Department of Environment, Food and Agriculture unless
I can confirm that this decision has been made by a Principal Planner in accordance with the authority afforded to that Officer by the appropriate DEFA Delegation.
Signed : C BALMER Chris Balmer Principal Planner
Customer note
This copy of the officer report reflects the content of the file copy and has been produced in this form for the benefit of our online services/customers and archive records.
Copyright in submitted documents remains with their authors. Request removal
View as Markdown