Loading document...
Application No.: 18/01351/C Applicant: Onchan District Commissioners Proposal: Change of use of first floor from retail to offices (class 2 or class 4) Site Address: First Floor Elm Tree House Main Road Onchan Isle Of Man IM3 1AH Planning Officer: Mr Nick Salt Expected Decision Level: Officer Delegation Recommended Decision: Permitted Date of Recommendation: 04.02.2019 _________________________________________________________________
C : Conditions for approval N : Notes attached to conditions C 1. The development hereby approved shall be begun before the expiration of four years from the date of this decision notice.
Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals.
This decision relates to the following plans and drawings, date stamped received on 2nd January 2019:
None _____________________________________________________________________________
1.0 THE SITE - 1.1 The site is the first floor of Elm Tree House, Main Road, Onchan. The site forms part of one of the main buildings in Onchan Village centre, fronting directly onto the Main Road. - 1.2 At present, the building is split into offices on the second floor, and retail on both the first and ground floors. There are 3 designated parking spaces at the rear of the site accessible from Elm Tree Road.
2.0 THE PROPOSAL - 2.1 Proposed is the change of use from retail to office use on the first floor. No external changes are proposed, and parking provision is expected to remain as it is. The ground floor and second floors are separate and would remain classed as retail and office respectively.
3.0 PLANNING POLICY - 3.1 The site is zoned within the Onchan Local Plan (2000) as Mixed Use for Retail, Residential and Office Use. - 3.2 A number of polices of the Isle of Man Strategic Plan 2016 are considered relevant to this application. They are detailed below. - 3.3 Strategic Policy 9 is considered as the proposal if for a change of use to offices: "All new retail development (excepting neighbourhood shops and those instances identified in Business Policy 5) and all new office development (excepting corporate headquarters suitable for a business park(1) location) must be sited within the town and village centres on land zoned for these purposes in Area Plans, whilst taking into consideration Business Policies 7 and 8." - 3.4 General Policy 2 goes into some detail around development within zoned areas and the key points of considerations for the same, it states (in part):
"Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development:
3.5 Business Policy 7 also states that "new office floor space should be located within town and village centres on land which is zoned for the purpose on the appropriate area plan." - 3.6 Paragraph 11.5.2: "In respect of town centre office development, it has been the Department's usual practice to require the provision of one parking space per 50sq metres of nett office floor space, such parking spaces to be provided preferably on site but otherwise conveniently close to the site. The standard of 1 space per 50sq metres is based on: 1/3 staff walking or cycling: 1/3 travelling by public transport and 1/3 by private car." - 3.7 Transport Policy 7 confirms this; "The Department will require that in all new development, parking provision must be in accordance with the Department's current standards."
These standards are set out in Appendix 7 of the Strategic Plan and follow those stated in 11.5.2. Under A.7.6, these standards may be relaxed where development: "(d) is within a reasonable distance of an existing or proposed bus route and it can be demonstrated a reduced level of parking will not result in unacceptable on street parking in the locality."
4.0 PLANNING HISTORY - 4.1 85/00302/B Alterations and additions to form additional 1st floor office accommodation and re-arrangement of 2nd floor toilets, Elm Tree House, Onchan. Permitted. - 4.2 14/01383/B Conversion from Emergency Services HQ to retail and office space. Permitted.
5.0 REPRESENTATIONS - 5.1 No comments have been submitted in relation to this application.
6.0 ASSESSMENT - 6.1 It is considered that the main issues in the assessment of this application are:
6.4 Parking Provision.
7.0 CONCLUSION - 7.1 The proposal is, on balance, in compliance with the aforementioned policies and is therefore recommended for approval.
8.0 INTERESTED PERSON STATUS - 8.1 By virtue of the Town and Country Planning (Development Procedure) (No 2) Order 2013 Article 6(4), the following persons are automatically interested persons:
8.2 The decision maker must determine:
I can confirm that this decision has been made by the Head of Development Management in accordance with the authority afforded to that Officer by the appropriate DEFA Delegation.
Decision Made : Permitted Date : 08.02.2019 Determining officer
Signed : S BUTLER Stephen Butler Head of Development Management
Copyright in submitted documents remains with their authors. Request removal
View as Markdown