Planning Approval Decision Notice
Isle of Man Town and Country Planning Act 1999
The Town and Country Planning (Development Procedure) Order 2005
Kelly Lewthwaite Building Design 23 Market Street Douglas IM1 2PA
In pursuance of powers granted under the above Act and Order the PLANNING COMMITTEE of the Department of Infrastructure does hereby APPROVE the following application made on behalf of:
Name: Mr & Mrs Les Smith Proposal: Erection of a detached garage and creation of additional vehicular access at: Woodlands Alexander Drive Douglas Isle of Man IM2 3QU
which was considered on 13th October 2011, subject to compliance with the conditions specified below.
Date of Issue: 18th October 2011
Murray House Mount Havelock Douglas
Mrs P Faragher Deputy Secretary to the Planning Committee
Schedule Of Conditions:
- The development hereby permitted shall commence before the expiration of four years from the date of this notice.
- This permission relates to the erection of a detached garage and the creation of an additional vehicular access as shown in drawing numbers WL/11/192/1B, WL/11/192/2B, WL/11/192/3B, WL/11/192/4, WL/11/192/5B and WL/11/192/6B date stamped 15th July 2011.
- No development shall take place until samples of the facing and roofing materials have been submitted to and approved in writing by the Planning Authority; thereafter the development shall be carried out in accordance with the approved materials.
- No development or other operations shall be commenced on this site until adequate steps, which shall have been previously approved in writing by the Planning Authority, have been taken to safeguard against damage or injury during construction works to all trees on the site, or those trees whose root structure may extend within the site. In particular no excavations, site works, trenches or channels shall be cut or pipes or services laid or any other works carried out in such a way as to cause damage or injury to the trees by interference with their root structure and no soil or waste shall be deposited on the land in such a position as to be likely to cause damage or injury to the trees.
- No development shall take place until a window schedule has been submitted to and approved in writing by the Planning Authority; thereafter the development shall be carried out in accordance with the approved details.
- No development shall take place until details of the dehumidifiers and mechanical extract ventilation have been submitted to and approved by the Planning Authority; thereafter the development shall be carried out in accordance with the approved details.
This decision was made by the Planning Committee constituted in accordance with Article 3(1) of the Town and Country Planning (Development Procedure) Order 2005.
Guidance Note
This permission refers only to that required under the Town and Country Planning (Development Procedure) Order 2005.
Any appeal against this decision must be in writing and must be received by this Department within 21 days of the date of this notice.
A form and guidance notes are available from either the Planning Office, Tel 685950, or to download from the Department’s website www.gov.im/transport/planning/plan/applications/decision.xml
Please note that a copy of the Officer’s report which led to the decision, together with correspondence relative to the application, is available for inspection at the Department.
The proposed development must not be commenced until either;
- The time for requesting an appeal has expired; or
- Any appeal has been determined;
Whichever is the later.